Cuda during March 06 freshening
A few shots of the March '06 buildup
The following pictures are of the early Spring '06 projects. The engine was taken out and built back to stock specs, the engine bay was redone and painted, and all new wiring was installed from the fuse box out to the nose. The last few shots is of the trouble spots that was mentioned on the opening page. There is a small bubble, smaller than a pencil eraser, on either side low in front of the rear wheels. This is very common on E bodies, if you find one that don't have a little spot in this location, its because its already been fixed. They all do it.
360 getting ready for tear down
Tear down day
Fresh B5 being sprayed
Engine just set in, before all plumbing was attached
Here is a shot of the solid floor pans before the new Legendary carpet was installed
passenger side lower front rear wheel well
Drivers side lower rear quarter in front of wheel well